June 7, 2024September 3, 2024 |Category: This Week’s Highlights Renovation works to the toilets on Levels 2 to 4 of the Sanctuary block has been completed.New features introduced are safety grab bars, diaper changing stations, bidet sprays, and non-slip floor tiles. Thank you for your patience.You may use the toilets on Level 1 to 4 of the Sanctuary block or at the Covenant Centre.教会大堂2楼至4楼厕所的翻新工程已完成。 引入的新功能包括安全扶手、尿布更换站、坐浴盆喷雾和防滑地砖。感谢您的耐心等待。 您可以使用教会大堂1楼至4楼或圣所的厕所。 Share:
Follow Us On